Project
Your current position:Home Project C.Pier and Marine Foundation Construction Central Pier No.2 at Central Reclamation

  • Central Pier No.2 at Central Reclamation

    The project is to build a sea foundation for a new terminal betwwen two ferry terminals inoperation. Some of the piles must pass through the existing vertical seawall, which includes the steel pipe piles 82 roots(pile length50-72 meters), dynamic and static load test, pile mud and reinforced concrete irrigation.