Project
Your current position:Home Project A.EPC Indonesia Batam Shipyard Terminal and Channel Dredging Project

  • 100,000DWT jetty with a width of 16m, a length of 360m, and 312 piles of 900mm diameter steel pipe piles. The upper structure is cast-in-place beam, prefabricated longitudinal beam and track beam, and the panel is prefabricated cast-in-place structure. The port fairway and  basin dredged 8.76 million cubic meters, which is the first time for the company to undertake foreign project under the form of the general contracting of design engineering.